This opportunity is available on GSA eBuy.

The objective of this JCC2 program is to provide the DoD, through Air Force Life Cycle Management HNC (AFLCMC/HNC), technical and expert level support to the Joint Staff, Combatant Commands and the Services. This effort will provide the Joint Force with JCC2 Training and Field Application Engineering to integrate and optimize the range of current and future JCC2 applications across the Department of Defense (DoD).

SCOPE

The JCC2 Program Management Office will utilize this contract to support the Warfighter needs for operational expertise via program funded Field Application Engineers (FAE).

Offices of the Secretary of Defense, Combatant Commands, Services, and other Agencies may choose to fund their own FAEs through this contract in 12-month increments. Rates for new FAEs may include additional cost as agreed upon with the funding element such as cost of living adjustments mandated for the area, travel, living or requisite insurance costs associated with the host location or site. FAEs provide on-site technical expertise in all aspects of JCC2 use and provide a direct conduit between the Government PMO and the Stakeholders within the Command they support.

The services required under this FAE contract include all disciplines required for JCC2 Software support at the Tier-1 level to include maintenance/sustainment of JCC2 systems in accordance with (IAW) applicable guidance, policies, and directives, . These services will be applied to all systems and activities within the JCC2 portfolio supporting mission operations locally and remotely.

The contractor shall support existing applications to include but not limited to JCO, JCC2-R, TASC, MADSS capabilities. JCC2 capabilities operate at the Unclassified, Secret, and Top- Secret classification domains.

The contractor shall provide sustainment support, documentation support (maintain and update JCC2 documents), admin training support, and other forms of support for JCC2. JCC2 is composed of Mission Applications, Cloud based infrastructure on which the Mission Applications run, which the Contractor shall provide necessary support for all applications on the infrastructures deployed.

The total PoP for this Task Order is 36 months which includes a 12-month base with two 12-month options.

Read more here.

Ad



Not Yet a Premium Partner/Sponsor? Learn more about the OS AI Premium Corporate and Individual Plans here. Plans start at $250 annually.

How useful was this post?

Click on a star to rate it!

We are sorry that this post was not useful for you!

Let us improve this post!

Tell us how we can improve this post?

Leave a Reply